HDD Work project • Thane, Maharashtra
A trenchless crossing executed to pass the pipeline beneath a sensitive surface corridor without open excavation across the crossing. The scope included pit preparation, HDD support and pullback coordination.
Share the location, work scope and manpower or equipment requirement with our team.