Controlled reopening of existing pipeline corridors
Re-trenching is used where an existing route needs to be reopened for repair, modification, extension or correction. Because buried assets may already be present, excavation is planned and executed with additional care and closer site coordination.
Our site team coordinates manpower, operators, access and equipment around the approved client scope. Execution is sequenced so each work front is ready for the next pipeline activity with minimal avoidable delay.
Review alignment, access, activity sequencing and resource requirements before starting.
Deploy the right crew and equipment to the active work front with site coordination.
Complete the activity and prepare the area for inspection, restoration or the next construction stage.
Share the location, work scope and manpower or equipment requirement with our team.