Tie In

Final connection of pipeline sections and station interfaces

Tie In

What Tie In involves

Tie-in work connects completed pipe sections to each other, to existing networks or to station piping. It requires accurate fit-up, controlled welding and inspection because the joint becomes part of the final pressure-containing system.

How we support the work

Our site team coordinates manpower, operators, access and equipment around the approved client scope. Execution is sequenced so each work front is ready for the next pipeline activity with minimal avoidable delay.

Typical scope

  • Excavation and access preparation
  • Pipe end preparation and alignment
  • Fit-up and welding support
  • Inspection / NDT coordination
  • Field-joint coating and protection
  • Backfilling support after acceptance

Common applications

  • New-to-new section connections
  • New-to-existing network connections
  • Valve-station interfaces
  • Repair and modification works
Discuss Tie In

Planning

Review alignment, access, activity sequencing and resource requirements before starting.

Execution

Deploy the right crew and equipment to the active work front with site coordination.

Handover Readiness

Complete the activity and prepare the area for inspection, restoration or the next construction stage.